Monday, August 29, 2011

MTA News

Per the MTA,
Service Plan for Monday Morning Subways: With limited exceptions, service will resume across the subway system at 6:00 a.m. Monday morning. Service will be less frequent than normal, and customers should expect longer waits and more crowded trains. Frequency of service will improve over the course of the day. The MTA’s regular fare policy will resume Monday morning at 5:00 a.m.
· Exceptions:
-3 trains will operate between
137th Street
/City College and New Lots Avenue; Substitute bus service will be provided between Harlem
148th Street
and
135th Street
connecting with the 2 train.
-C trains suspended; A trains will make all local stops from
207th St.
to
Lefferts Blvd.
-No service in the Rockaways. (
Rockaway Blvd.
to Far Rockaway and Rockaway Park)
-6 trains runs local in the Bronx
-7 trains run local
-
S Franklin Avenue
Shuttle (FAS) Suspended
-N trains terminate at
Kings Highway
. Shuttle bus service between
Kings Highway
and Stillwell Terminal.

· The Staten Island Railway will resume normal service at midnight tonight.

Buses: Limited bus service was restored in all five boroughs of New York City earlier this evening. Service levels will continue to increase but may not reach normal levels Monday.

Bridges and Tunnels: All MTA Bridges and Tunnels are open as of 7:00 p.m Sunday. The MTA’s toll policy will resume Monday morning at 5:00 a.m.
Access-a-Ride and Able Ride: Are expected to be operating normal service beginning at noon Monday. In the morning, these services will help return evacuees to their homes.

Metro-North and LIRR: Additional details on Metro-North and LIRR service will be provided as soon as they become available

No comments:

Post a Comment